冷再生機出租之水泥改良土施工流程
來源:http://www.yyx11.cn/ 日期:2021-07-30 發(fā)布人:
一、適用范圍
1、 Scope of application
冷再生機出租為保證路床厚度范圍內(nèi)的CBR值和壓實度達(dá)到規(guī)范要求,全線路床上部36cm厚采用6%水泥土處理。針對低填淺挖路基,當(dāng)路基填方高度或挖方深度≤155cm時,路床下部44cm厚換填4%的水泥土處理,路床上部36cm厚換填6%水泥土處理。
In order to ensure that the CBR value and compactness within the thickness range of the roadbed meet the specification requirements, the 36cm thick upper part of the roadbed of the whole line is treated with 6% cement soil. For low fill and shallow excavation subgrade, when the subgrade filling height or excavation depth is ≤ 155cm, the 44cm thick lower part of the roadbed shall be replaced with 4% cement soil, and the 36cm thick upper part of the roadbed shall be replaced with 6% cement soil.
二、作業(yè)準(zhǔn)備
2、 Job preparation
1、冷再生施工租賃場地準(zhǔn)備
1. Preparation of rental site for cold regeneration construction

(1)直接填筑的路基基底,施工前必須通過審查簽證;需要進(jìn)行地基處理的基底必須完成各項處理,并滿足地基處理的要求。
(1) The subgrade base directly filled must pass the examination and visa before construction; For the base requiring foundation treatment, various treatments must be completed and meet the requirements of foundation treatment.
(2)場地應(yīng)該保證足夠的平整度,滿足設(shè)備、人員進(jìn)場要求。
(2) The site shall ensure sufficient flatness to meet the mobilization requirements of equipment and personnel.
(3)做好場地的臨時排水和防雨措施。按照施工運量和施工機械的大荷載修筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. The construction access road shall be built according to the construction traffic volume and the large load of construction machinery.
2、技術(shù)準(zhǔn)備
2. Technical preparation
做好相關(guān)人員的技術(shù)培訓(xùn)和技術(shù)交底工作,使參加施工的全體人員充分認(rèn)識高速鐵路路基填筑的關(guān)鍵技術(shù)、質(zhì)量控制要點。
Do a good job in technical training and technical disclosure for relevant personnel, so that all personnel participating in the construction can fully understand the key technologies and quality control points of subgrade filling of high-speed railway.
3、勞動力、機械設(shè)備配置
3. Allocation of labor force and mechanical equipment
人員、機械設(shè)備應(yīng)根據(jù)施工方案組合工期要求進(jìn)行合理的配置。路堤填筑區(qū)為一個完整的作業(yè)區(qū),每個作業(yè)區(qū)人員配置:施工隊長1名,領(lǐng)工員2名,指揮卸土位置人員2名,測量及試驗檢測人員4~6人,其他機械工、普工20~30人。
The combination of machinery and equipment shall be reasonable according to the requirements of construction period. The embankment filling area is a complete operation area, and the staffing of each operation area is: 1 construction team leader, 2 foremen, 2 personnel directing the unloading position, 4 ~ 6 measurement and test personnel, and 20 ~ 30 other mechanics and general workers.
根據(jù)施工需要,每個作業(yè)面配備反鏟挖掘機一臺、宣化-140推土機一臺、YZ-22振動壓路機兩臺、天工-160平地機一臺,徐工-230灰土拌和機,自卸運輸車6輛,撒水車一臺備用。當(dāng)運距較遠(yuǎn)時,自卸車的數(shù)量可適當(dāng)增加
According to the construction needs, each working face is equipped with one backhoe excavator, one xuanhua-140 bulldozer, two yz-22 vibratory rollers, one tiangong-160 grader, xcmg-230 lime soil mixer, 6 dump trucks and one sprinkler for standby. When the transportation distance is long, the number of dump trucks can be increased appropriately
下一篇:冷再生機是解決道路全深度翻新的平臺 上一篇:維特根冷再生設(shè)備到底怎么樣?
閱讀/ Recommended reading
- 冷再生機租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
- 冷再生機租賃:道路養(yǎng)護的 “省錢省力魔法棒” 2025-07-01
- 冷再生機租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
- 舊路翻新 “神器” 大盤點:那些給力的冷再生機型號 2025-06-20
水泥撒布車料倉:讓存量監(jiān)測成為 “一目了然的智慧管家”
[2025-07-03]
在道路施工的 “戰(zhàn)場” 上,水泥撒布車如同精準(zhǔn)的 “材料輸送兵”,而其料倉內(nèi)的物料存量監(jiān)測,則是保障施工順利進(jìn)行的關(guān)鍵環(huán)節(jié)。如何讓施工人員隨時掌握料倉內(nèi)水泥的 “儲備情況”,...