国产精品扒开腿做爽爽爽日本无码,亚洲成AV人片在WWW色猫咪,亚洲ⅴ国产v天堂a无码二区,一个人看的视频免费高清

冷再生施工和機械租賃業(yè)務(wù)
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心

就地冷再生柔性基層路面的檢查

來源:http://www.yyx11.cn/ 日期:2022-02-11 發(fā)布人:
從挖探結(jié)果顯示,原有瀝青路面厚14cm,基層為強度較高二灰鎂碴,沿線多處有不同程度的翻漿、坑槽、裂紋等,原路的縱橫坡度已不能滿足路面排水要求。路面現(xiàn)有承載力較低。營大路的路況調(diào)查結(jié)果顯示,營大路目前存在的問題主要有以下幾點:
The excavation results show that the original asphalt pavement is 14cm thick, and the base is lime fly ash magnesium slag with high strength. There are mud churning, pits, cracks, etc. in many places along the line. The vertical and horizontal slopes of the original road can no longer meet the pavement drainage requirements. The existing bearing capacity of the pavement is low. The road condition survey results of Yingda road show that the main existing problems of Yingda road are as follows:
(1)目前右半幅路面病害很小,個別路段出現(xiàn)輕微裂紋,路面平整度較差,路面基本完好。從挖探結(jié)果顯示,瀝青路面厚14cm,基層二灰鎂碴強度較高。
(1) At present, the disease of the right half of the road is very small, some sections have slight cracks, the pavement flatness is poor, and the pavement is basically intact. The excavation results show that the thickness of asphalt pavement is 14cm, and the strength of lime fly ash magnesium slag is high.
(2)左半幅瀝青路面厚10cm,多處有翻漿、坑槽、裂紋等,基層松散,不成板體,土基含水量為19.5%,部分路面低于人行道外綠地,兩側(cè)沒有邊溝,排水困難。
(2) The left half of the asphalt pavement is 10cm thick, with mud churning, pits, cracks, etc. in many places. The base course is loose and does not form a plate body. The water content of the soil foundation is 19.5%. Some pavements are lower than the green space outside the sidewalk. There are no side ditches on both sides, so it is difficult to drain.
冷再生機租賃
(3)測量結(jié)果顯示,原路的橫坡度平均在1%,較小縱坡為0,已不能滿足路面排水要求。
(3) The measurement results show that the average cross slope of the original road is 1%, and the smaller longitudinal slope is 0, which can not meet the requirements of pavement drainage.
(4)路面現(xiàn)有實測彎沉為80一130/0.01 mm,
(4) The measured deflection of the existing pavement is 80-130 / 0.01 mm,
(5)現(xiàn)有路面南北兩側(cè)存在較大高差。
(5) There is a large elevation difference between the north and south sides of the existing pavement.
高差小于5cm的占全線的68.5%;
The height difference less than 5cm accounts for 68.5% of the whole line;
高差大于5cm、小于IOcm的占全線的22.7%;
The height difference greater than 5cm and less than IOCM accounts for 22.7% of the whole line;
高差大于10cm、小于15cm的占全線的7.6%;
The height difference greater than 10cm and less than 15cm accounts for 7.6% of the whole line;
高差大于15cm、小于20cm的,占全線的1.1%,
The height difference greater than 15cm and less than 20cm accounts for 1.1% of the whole line,

閱讀/ Recommended reading

  在道路施工的 “戰(zhàn)場” 上,水泥撒布車如同精準的 “材料輸送兵”,而其料倉內(nèi)的物料存量監(jiān)測,則是保障施工順利進行的關(guān)鍵環(huán)節(jié)。如何讓施工人員隨時掌握料倉內(nèi)水泥的 “儲備情況”,...

冷再生機租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
冷再生機租賃:道路養(yǎng)護的 “省錢省力魔法棒” 2025-07-01
冷再生機租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
舊路翻新 “神器” 大盤點:那些給力的冷再生機型號 2025-06-20

產(chǎn)品/ Recommended products