新聞中心
新聞資訊
聯(lián)系我們

山東途暢路橋工程有限公司
聯(lián)系人:石總
電話:18264104888
地址:山東省濟(jì)南市槐蔭區(qū)經(jīng)一路273號群盛華城
冷再生機(jī)在道路施工前有哪些要求
來源:http://www.yyx11.cn/ 日期:2022-02-16 發(fā)布人:
在以前道路施工的時(shí)候,是需要將舊的瀝青路面鏟除,造成了很大的浪費(fèi),而現(xiàn)在冷再生機(jī)出現(xiàn),可以減少浪費(fèi)。冷再生機(jī)是指瀝青路面就地冷再生是利用一體的再生設(shè)備、添加材料、一次拌和成型工藝,通過新鋪結(jié)構(gòu)面層,構(gòu)成舊路面改造新的一套完整體系。
In the previous road construction, it was necessary to eradicate the old asphalt pavement, resulting in a lot of waste. Now the emergence of cold regenerator can reduce waste. Cold recycling machine refers to the in-situ cold recycling of asphalt pavement. It uses the integrated recycling equipment, added materials and one-time mixing and forming process to form a new complete system for the reconstruction of old pavement through the newly paved structural surface.
準(zhǔn)備工作:冷再生租賃前的各項(xiàng)準(zhǔn)備工作在施工前到位,確保工期正常進(jìn)行。主要內(nèi)容包括:人員準(zhǔn)備、機(jī)械準(zhǔn)備、材料準(zhǔn)備、交通協(xié)調(diào)及后勤保障。
Preparations: all preparations before cold regeneration lease shall be in place before construction to ensure the normal construction period. The main contents include: Personnel Preparation, machinery preparation, material preparation, traffic coordination and logistics support.


材料要求:水泥選用強(qiáng)度等級為32.5、初凝時(shí)間≥3h、終凝時(shí)間≤10h且≥6h硅酸鹽或普通硅酸鹽水泥。水泥應(yīng)具有良好的工作性、低水化、高后期強(qiáng)度、耐久性、耐腐蝕性和抗裂性能。
Material requirements: Portland or ordinary portland cement with strength grade of 32.5, initial setting time ≥ 3h, final setting time ≤ 10h and ≥ 6h shall be selected. The cement shall have good workability, low hydration, high late strength, durability, corrosion resistance and crack resistance.
機(jī)械要求:工程施工過程通過再生機(jī)組來完成,再生機(jī)組包括:冷再生主機(jī)、水泥稀漿車、平地機(jī)、壓路機(jī)等。
Mechanical requirements: the construction process of the project is completed by regeneration unit, which includes cold regeneration host, cement slurry truck, grader, roller, etc.
人員要求:工程技術(shù)人員及機(jī)械操作人員應(yīng)經(jīng)過冷再生培訓(xùn)并經(jīng)過考核合格后方可上崗。
Personnel requirements: engineering technicians and mechanical operators shall receive cold regeneration training and pass the examination before taking the post.
工程協(xié)調(diào):作好施工總體計(jì)劃,采取不中斷交通半幅施工,作好施工期間交通疏導(dǎo)工作,準(zhǔn)備施工作業(yè)面的遮擋。
Project coordination: make the overall construction plan, take half width construction without interrupting traffic, do a good job in traffic dredging during construction, and prepare for the shelter of the construction surface.
本文由冷再生機(jī)租賃為您提供,我們的網(wǎng)站是:http://www.yyx11.cn 我們將以全心全意的熱情為您提供服務(wù),歡迎您的訪問
This article is provided for you by the cold regenerator rental. Our website is: http://www.yyx11.cn We will provide you with services with wholehearted enthusiasm. Welcome to visit
閱讀/ Recommended reading
- 冷再生機(jī)租賃:路面 “回春妙手” 能解哪些難題? 2025-07-02
- 冷再生機(jī)租賃:道路養(yǎng)護(hù)的 “省錢省力魔法棒” 2025-07-01
- 冷再生機(jī)租賃:解鎖路面 “煥新” 的全能技能包 2025-06-24
- 舊路翻新 “神器” 大盤點(diǎn):那些給力的冷再生機(jī)型號 2025-06-20
水泥撒布車料倉:讓存量監(jiān)測成為 “一目了然的智慧管家”
[2025-07-03]
在道路施工的 “戰(zhàn)場” 上,水泥撒布車如同精準(zhǔn)的 “材料輸送兵”,而其料倉內(nèi)的物料存量監(jiān)測,則是保障施工順利進(jìn)行的關(guān)鍵環(huán)節(jié)。如何讓施工人員隨時(shí)掌握料倉內(nèi)水泥的 “儲備情況”,...