国产精品扒开腿做爽爽爽日本无码,亚洲成AV人片在WWW色猫咪,亚洲ⅴ国产v天堂a无码二区,一个人看的视频免费高清

冷再生施工和機械租賃業(yè)務(wù)
筑路架橋,奉獻社會;以人為本,不斷創(chuàng)新

服務(wù)熱線

18264104888

新聞中心

首頁>>新聞中心

水泥灑布車在交叉口冷再生接縫處理中的技術(shù)要點解析

來源:http://www.yyx11.cn/ 日期:2025-06-05 發(fā)布人:

  交叉口作為道路網(wǎng)絡(luò)的關(guān)鍵節(jié)點,其路面質(zhì)量直接影響交通流暢度與行車。冷再生技術(shù)作為綠色的養(yǎng)護工藝,在交叉口維修中廣泛應(yīng)用,而接縫處理是決定冷再生層整體性的核心環(huán)節(jié)。水泥灑布車作為冷再生施工的關(guān)鍵設(shè)備,其操作精度與工藝控制直接關(guān)系到接縫質(zhì)量。

  As a key node in the road network, the road surface quality of intersections directly affects traffic flow and driving safety. Cold recycling technology, as a green and efficient maintenance process, is widely used in intersection maintenance, and joint treatment is the core link that determines the integrity of the cold recycling layer. As a key equipment for cold recycling construction, the operation accuracy and process control of cement distribution trucks are directly related to the quality of joints.

  施工前需進行精細化準(zhǔn)備。對交叉口原路面進行評估,利用落錘式彎沉儀檢測承載能力,確定冷再生深度通常為15-20厘米。采用銑刨機對舊瀝青層進行預(yù)處理,控制銑刨速度在6-8米/分鐘,確保再生料級配符合設(shè)計要求。水泥灑布車需提前進行計量系統(tǒng)校準(zhǔn),通過靜態(tài)標(biāo)定與動態(tài)撒布試驗,將撒布量誤差控制在±0.5千克/以內(nèi),特別對接縫區(qū)域設(shè)置0.5-1.0米的重疊撒布帶,防止出現(xiàn)素土夾層。

  Fine preparation is required before construction. Firstly, a comprehensive evaluation of the original road surface at the intersection is conducted, using a drop hammer deflectometer to detect the bearing capacity and determine that the cold regeneration depth is usually 15-20 centimeters. Pre treat the old asphalt layer using a milling machine, controlling the milling speed at 6-8 meters per minute to ensure that the gradation of recycled materials meets the design requirements. The cement spraying truck needs to undergo calibration of the measuring system in advance. Through static calibration and dynamic spraying tests, the spraying amount error should be controlled within ± 0.5 kg/square meter. In particular, overlapping spraying belts of 0.5-1.0 meters should be set up in the joint area to prevent the occurrence of soil interlayers.

  接縫處理工藝需分階段控制。在橫向接縫處,采用端部切割法形成垂直斷面,使用高壓空氣壓縮機松散顆粒,露出新鮮骨料。水泥灑布車在此區(qū)域采用雙層撒布工藝,首層按設(shè)計量撒布,第二層增加10%-15%的撒布量,形成梯度結(jié)合面??v向接縫則采用搭接法,搭接寬度控制在20-30厘米,通過車載GPS定位系統(tǒng)確保重疊精度,避免出現(xiàn)漏撒或過量。

  The seam treatment process needs to be controlled in stages. At the transverse joint, the end cutting method is used to form a vertical section, and a high-pressure air compressor is used to remove loose particles and expose fresh aggregates. The cement spreader adopts a double-layer spreading process in this area. The first layer spreads according to the design amount, and the second layer increases the spreading amount by 10% -15% to form a gradient bonding surface. The longitudinal seam adopts the overlapping method, with the overlapping width controlled at 20-30 centimeters. The overlapping accuracy is ensured through the vehicle GPS positioning system to avoid leakage or excess.

  施工過程中需關(guān)注環(huán)境因素。當(dāng)氣溫低于10℃或高于35℃時,需在水泥中添加早強劑或緩凝劑,調(diào)整初凝時間4-6小時。雨季施工時,在接縫處增設(shè)防水土工布,防止雨水滲透影響水泥水化反應(yīng)。對于重載交通交叉口,在接縫位置下方鋪設(shè)玻璃纖維格柵,層間粘結(jié)強度可提升30%以上,有效延緩反射裂縫產(chǎn)生。

  During the construction process, special attention should be paid to environmental factors. When the temperature is below 10 ℃ or above 35 ℃, early strength agent or retarder should be added to the cement, and the initial setting time should be adjusted to 4-6 hours. During rainy season construction, waterproof geotextile should be added at the joints to prevent rainwater infiltration from affecting the cement hydration reaction. For heavy-duty traffic intersections, laying fiberglass grids below the joint position can increase interlayer bonding strength by more than 30%, effectively delaying the occurrence of reflective cracks.

  質(zhì)量控制貫穿施工全周期。采用核子密度儀對接縫處進行實時檢測,壓實度需達到設(shè)計值的98%以上。利用激光平整度儀進行橫向斷面掃描,接縫處高差控制在3毫米以內(nèi)。養(yǎng)護期間,在接縫位置覆蓋無紡布,每日灑水3-4次,保持表面濕潤狀態(tài)持續(xù)7天,促進水泥充分水化。

  Quality control runs through the entire construction cycle. Real time detection of the joint using a nuclear density meter, with a compaction degree of over 98% of the design value. Use a laser flatness meter to scan the transverse section, and control the height difference at the joint within 3 millimeters. During the maintenance period, cover the joint position with non-woven fabric and sprinkle water 3-4 times a day to keep the surface moist for 7 days, promoting sufficient hydration of cement.

20220303073357139.png

  特殊工況需采取專項措施。對于曲線半徑小于50米的交叉口,采用分段撒布法,每段長度控制在8-10米,通過車載角度傳感器自動調(diào)整噴嘴方向,確保水泥分布均勻。在橋梁引道與路面接縫處,設(shè)置30厘米寬的聚酯纖維增強帶,抗拉強度可達800牛/5厘米,有效應(yīng)對不均勻沉降。

  Special measures need to be taken for special working conditions. For intersections with a curve radius less than 50 meters, the segmented spreading method is used, with each segment length controlled between 8-10 meters. The nozzle direction is automatically adjusted by a vehicle mounted angle sensor to ensure even distribution of cement. At the joint between the bridge approach and the road surface, a 30 centimeter wide polyester fiber reinforced tape is installed, with a tensile strength of up to 800 N/5 cm, effectively dealing with uneven settlement.

  后期評估顯示,采用精細化接縫處理技術(shù)的交叉口冷再生層,其使用壽命較傳統(tǒng)工藝延長40%-50%,接縫處車轍深度降低60%以上。建議建立數(shù)字化施工檔案,通過車載終端記錄撒布量、施工位置、環(huán)境參數(shù)等數(shù)據(jù),為后期養(yǎng)護提供決策支持。隨著智能施工裝備發(fā)展,配備3D攤鋪系統(tǒng)的水泥灑布車可實現(xiàn)接縫位置的毫米級控制,推動冷再生技術(shù)向更高精度方向發(fā)展。

  Post evaluation shows that the use of refined joint treatment technology in the cold regeneration layer of intersections extends its service life by 40% -50% compared to traditional processes, and reduces the rut depth at the joint by more than 60%. It is recommended to establish a digital construction archive, which records data such as spreading amount, construction location, and environmental parameters through vehicle mounted terminals, to provide decision support for later maintenance. With the development of intelligent construction equipment, cement sprinklers equipped with 3D paving systems can achieve millimeter level control of joint positions, promoting the development of cold recycling technology towards higher precision.

  本文由冷再生機租賃友情奉獻.更多有關(guān)的知識請點擊:http://www.yyx11.cn真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻.敬請期待.

  This article is a friendly contribution from Cold Recycling Machine Rental For more information, please click: http://www.yyx11.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

閱讀/ Recommended reading

  凍土區(qū)道路養(yǎng)護面臨極端氣候與地質(zhì)條件的雙重挑戰(zhàn),冷再生技術(shù)作為綠色修復(fù)方案,其層間穩(wěn)定性直接決定工程壽命。針對凍融循環(huán)導(dǎo)致的強度衰減、界面剝離等難題,需構(gòu)建涵蓋材料改性、結(jié)構(gòu)...

水泥灑布車在交叉口冷再生接縫處理中的技術(shù)要點解析 2025-06-05
瀝青路面與水泥路面再生工藝差異解析 2025-06-04
冷再生機出租能處理哪些路面? 2025-06-03
帶你詳細了解550冷再生機的原理及優(yōu)勢 2025-05-27

產(chǎn)品/ Recommended products